Construction period | 2025.07.31 ~ 2029.07.29 |
---|---|
Construction location | Sinpyeong-ri to Simgok-ri, Sinbuk-myeon, Pocheon-si |
Orderer | Gyeonggi Provincial Government |
Construction outline | Length (L): 2.86 km Road Width (B): 19.0 to 21.0 m Sidewalk Width: 2.0 to 2.5 m Number of Lanes: 4 lanes |